Logo.gifULTIMATE CONSULTANTS

We implement Shipyards

 

Home Slipway Shipyard Floating Dry Dock (FDD) Ship Lift

 

Graving (Basin) Dock 

3.jpg 4.jpg1.jpg2.jpg

Graving Docks

 

Graving Docks or Basin Docks are suitable for very large size ships and Oil Rigs. Cape size and bigger ships and large Oil rigs need Graving Docks for Dry Docking.

 

Depending on the size of ships planned, Dock size can be designed. The area of land required is 30.35 Hectares (75 Acres) with a water front of 100 metres. The land should be of roughly square in shape. Undredged draft of sea should be at least 7 metres. It can be dredged and increased to 11 or more metres.

Investment (calculated in January 2020) - USD 50 Million (excluding the cost of land).

 Time of completion 6 years.

Enquire

shipyardconsultancy@hotmail.com Phone/WhatsApp: +91 9940075660